RESOLUTION
NO.  _________________________
CHARTER TOWNSHIP OF VIENNA
FEE SCHEDULE
WHEREAS, Sections 6 and 22 of PA 230 of 1972 as amended, allows local munic-
ipalities to set fee schedules.
NOW, THEREFORE BE IT RESOLVED,  that effective __________________, the
following fee schedule is in effect:
BUILDING PERMIT FEES
BASED ON VALUE OF CONSTRUCTION
Amount
$0.00 - $3,000.00 $50.00
$3,001.00 - $5,000.00 $75.00
$5,001.00 - $10,000.00 $100.00
$10,001.00 - $50,000.00    $100.00 + $5.00 per $1,000.00
$50,001.00 - $100,000.00    $275.00 + $4.00 per $1,000.00
$100,001.00 - $500,000.00    $475.00 + $3.00 per $1,000.00
$500,001.00 - $1,000,000.00 $1,675.00 + $2.00 per $1,000.00
$1,000,001.00 - up $2,675.00 + $1.00 per $1,000.00
ELECTRICAL FEES
Residential Homes $180.00 Mobile home park site $6.00
Application fee $50.00 KVA & HP up to 20 $6.00
Modular Home $50.00 Units up to 21 to 50 $10.00
Service thru 200 amp $40.00 Units 51 and over $12.00
200 amp thru 600 amp $45.00 Fire Alarm Systems up to 10 $50.00
600 amp thru 800 amp $60.00 Fire Alarm Systems 11-20 $100.00
800 amp thru 1200 amp $80.00 Fire Alarm Systems 21 & up   $5.00 ea
over 1200 amp (gfi only) $100.00 Data/Telecommunication outlets   $5.00 ea
circuits - each $5.00 Energy Retrofit -temp control $45.00
Light fixtures - per 25 $6.00 Conduit only or grounding $45.00
Furnace - unit heater $5.00 Air conditioning $10.00
Dishwasher, disposal, etc $5.00 Special inspection $50.00
Electrical heating units $4.00 Each inspection $40.00
Power Outlets (ranges, etc) $7.00
Signs (unit, neon, letter) $40.00
Feeders - bus ducts per 50' $6.00
MECHANICAL FEES
Residential Homes $180.00 Air handlers under 10,000 cfm $15.00
Application fee $50.00 Air handlers over 10,000 cfm $30.00
Modular Home $50.00 Commercial Hoods $10.00
New furnace under 400,000 $30.00 VAV boxes $10.00
New furnace over 400,000 $45.00 Heat recovery units $10.00
Residential boiler $30.00 Unit ventilators $10.00
Water heater $7.00 Unit heaters $25.00
Solid fuel equipment $25.00 Fire suppression 20.00 plus 1.00/head
Chimney, factory built $25.00 Evaporator coils $30.00
Solar, set of 3 panels $20.00 Refrigeration, split system $30.00
Gas piping, each opening $5.00 chiller $30.00
Ductwork  (min 25.00) $25.00 cooling towers $30.00
Air conditioning $30.00 compressor $40.00
Heat pumps $30.00 LPG/fuel oil hook up $35.00
Bath & kitchen exhaust $10.00 Mobile home park site $6.00
Dryer vents $10.00 Each inspection $40.00
Under & above ground tanks $20.00 Exhaust Fan $20.00
Humidifiers $10.00 Commercial Roof-top $60.00
Piping systems - min 25.00      $.05/ft Safety Inspection $50.00
Gas Burning Fireplace $25.00
Flue/Vent Damper $7.00
PLUMBING FEES
Residential Homes $180.00 Manholes, catch basins $5.00
Application fee $50.00 Water dist pipe 3/4" $5.00
Modular home $50.00 1" $10.00
Mobile home park site $6.00 1 3/4" $15.00
fixtures/drains   $5.00 ea 1 1/2" $20.00
stacks   $3.00 ea 2" $25.00
Sewage ejectors, sumps   $5.00 ea over 2" $30.00
sub-soil drains $15.00 ea Reduced pressure zone
Water service less than 2" $5.00  back-flow preventer $5.00
2" to 6" $25.00 Safety inspections $50.00
Over 6" $50.00 Each inspection $40.00
Bldg connection $5.00
Sewers less than 6" $5.00
sewers more than 6" $25.00
Sump pump inspections $50.00
DEMOLITION
Residential $20.00
Other Structures Cost of Demolition
MISCELLANEOUS BUILDING DEPARTMENT FEES
Special Inspections $50.00
Renewals $20.00
Mobile Home Inspections $50.00
Remove a stop work order $100.00
Re-inspection, if necessary (when work is not completed) $50.00
Mortgage Inspection $100.00
Work started before permit issued double fee
One renewal of Building permit good for 6 months
PLAN REVIEW SERVICE FEE SCHEDULE
The fee for Plan Review is based on the volume of the building (except for Residential 1 & 2 Family)
VOLUME BUILDING CODE
(Cubic Feet) BASE PLAN REVISE*
Up to - 20,000 $65.00
20,001 - 40,000 $95.00
40,001 - 60,000 $125.00
60,001 - 80,000 $155.00
80,001 - 100,000 $185.00
100,001 - plus $215.00 plus $2.00 per each
10,000 cf
ZONING AND PLANNING FEES
Rezone request $300.00
Special Land Use $200.00
Special Meeting of the Planning Commission $400.00
Board of Appeals $300.00
Administrative Review $5,000.00
Site Plan Review: $1.00 per thousand of development
$50.00 minimum
$1,000.00 maximum
Any cost for outside review consulting, etc., as required by the Planning Commission or Building
Official will be totally the responsibility of the petitioner.
WIRELESS TELECOMMUNICATION
Application Fee $500.00
NATURAL RESOURCE RECOVERY
Permit Fee $500.00
Renewal $100.00
Liability Insurance $1,000,000.00
Security Deposit $2,000.00 per acre
PONDS AND LAKES
Permit Fee $200.00
Renewal Fee $100.00
Security Deposit $500.00
SOLID WASTE LANDFILL
Application Fee $1,000.00
Annual Application Fee $500.00
Liability Insurance $1,000,000.00
Amount of Bond $1,000.000.00
BOOKS AND MAPS
Zoning Ordinance book $35.00
Zoning Map only $4.00
Master Plan $15.00
Business Development Authority Guidelines $30.00
Township map (black and white) $2.00
FIRE DEPARTMENT VIOLATION FEES
Minimum Maximum
2nd offense within 1 year period $150.00 $500.00
3rd offense within 1 year period $325.00 $500.00
4th or more offense within 1 year period $500.00 $500.00
(Plus any costs incurred in connection with the infraction)
Fire report $5.00
LICENSE FEES
Used Car License $100.00
Used Equipment License $150.00
Junk Yard License $150.00
Solicitor Permit $50.00
ASSESSING DEPARTMENT FEES
Assessing record copy $1.00 per black & white copy
$3.00 per colored copy
Land Splits $25.00 for each legal description created
Mailing Labels on Disk $25.00
CEMETERY FEES
Lot fees - Residents $250.00
Non - resident $500.00
Grave openings - Week Days:
Adult grave $400.00
Infant grave $225.00
Cremation $100.00
Additional charges: Saturday Additional $50.00
Sunday or Holiday Additional $100.00
After 3:30 p.m. Additional $150.00
Relocation fee Twice the regular fee
POLICE DEPARTMENT FEES
Accident Report $5.00
Impound Fee $75.00
Breathalyzer Test $5.00
FREEDOM OF INFORMATION FEES
Duplication:
Copies made at Vienna Township:  $1.00 per page
Records to be carried to a Commercial Copy Facility:  Cost to be determined by facility, plus
mileage
Copy of meeting tape (If meeting is recorded):  $10.00 each
Computer disk:  $50.00
Mailing:
Envelopes - $1.00 each, small size, plus postage
$3.00 each, large size, plus postage
Hourly Labor Wage:
The hourly labor wage will be the lowest wage of the person capable of doing the work, to the
the nearest quarter of the hour.
Deposit:
If the anticipated charges are to exceed $50.00, a good faith deposit of one half of the
total anticipated charges shall be required.
If the requested records are to be taken to a Commercial facility to be copied, a
$500.00 check must be left on deposit at Vienna Township, to be returned uncashed at
the end of the third business day, if the requested records are returned intact.  After the
third business day the check will be cashed, and a $50.00 charge will be assessed for
each day until the records are returned intact.
Waiver of Fees:
If an individual submits an affidavit stating that he/she is receiving public assistance or is
able to state facts showing inability to pay fees because of indigency, a copy of a
public record shall be furnished without charge for the first $20.00 for each request.
MISCELLANEOUS FEES
Recycle bin $6.25 per bin
Garbage bags $20.00 per box
Return checks $20.00 per check
Mowing fee cost of labor, fuel and equipment ($75.00 minimum)
Foreclosure clean-up cost of labor, fuel and equipment ($75.00 minimum)
WATER FEES
Connection:
Owners of premises within the district in which water is used and for which direct
connection to the system is available as of the effective date hereof, shall pay an inspection and
approval fee to the County in the amounts as follows, at the time application is made for a permit
to connect said premises to the system.  The County shall transmit to the Township an amount of
$10.00 from the amount collected from each permit issued:
Meters:
5/8 inch meter $860.00
1 inch meter $935.00
1 1/2 meter $2,000.00
2 inch meter $3,080.00
meters over 2 inches $300.00 plus the cost of meter,
materials and labor
Readiness to Serve Charge:
5/8 inch meter $13.25
3/4 inch meter $16.89
1 inch meter $24.14
1 1/2 inch meter $42.25
2 inch meter $64.05
3 inch meter $114.84
4 inch meter $187.41
6 inch meter $368.82
8 inch meter $586.52
10 inch meter $876.78
12 inch meter $1,566.14
Irrigation meters will be charged a maximum readiness to serve of $16.89.
Usage fee:
All water customers will be charged $2.275 per 100 cubic feet of usage in addition to the
readiness to serve charge.
Quarterly Billing Rates:
Quarterly rates will be three time the readiness to serve charge plus each water
customer will be charged $2.275 per 100 cubic feet of usage.
Deposit File Fee (of which $50.00 in a non-refundable file fee) $50.00
SEWER FEES
Where the premises are served by water which is metered, the monthly charge shall be
based upon water consumption and shall be computed at the rate of $1.48 per hundred cubic feet.
Provided, however, that there shall be a minimum monthly charge of $8.52 per meter.
Where the premises are not served by water which is metered, the monthly charge shall
be at the rate of $25.00 per unit.
SEWER AND WATER TAP-IN RATES
Sewer $1,100.00
Sewer connection inspection fee $50.00
Water $1,000.00
WATER SHUT-OFF/TURN-ON FEES
Shut-off $12.00
Turn-on $5.00
SEWER AND WATER DEPOSIT
Deposit fee $1,000.00
ADOPTED:
Yeas : _________________________________________________________________________________
Nays : _________________________________________________________________________________
CERTIFICATION:
STATE OF MICHIGAN )
) SS:
COUNTY OF GENESEE )
We, the undersigned, do hereby certify that the foregoing is a true and complete copy of a
resolution adopted by the Township Board of the Charter Township of Viennas, Genesee County, Michigan,
at a regular meeting duly called and held on the ______ day of __________, 2008, the original of which
Resolution is on file in my office.
___________________________ __________ __________________________
Anthony McKerchie, Supervisor Richard Scott, Clerk
excel/f/winword/doc/txtres/
fee schedule for 2008